FaucetLeadTime:SamplingAndProduction|VIGA

Faucet Lead Time: Sampling and Production

Faucet Lead Time: Sampling and Production

Lead time is a key factor when planning a faucet import. VIGA is a faucet factory in China, and this page explains the faucet lead time for samples and bulk production, plus the factors that affect it.

Faucet Sample Lead Time

Stock faucet samples usually take 7 to 15 days. Custom OEM samples take longer because tooling, casting and special finishing must be prepared.

Faucet Bulk Production Lead Time

Bulk faucet production usually takes 25 to 45 days after sample approval and deposit, depending on the quantity, finish and packaging. Sea freight time is additional.

Factors That Affect Lead Time

  • Order quantity and number of models
  • Special finishes such as PVD or matte black
  • Custom logo, packaging or tooling
  • Material availability and production schedule

Can You Rush an Order

VIGA can sometimes shorten the lead time for stock models or urgent orders, but rush production depends on the current factory schedule and material availability.

See our China faucet factory page or contact us for a current lead time estimate.

FAQ

How long does faucet sampling take?

Stock samples usually take 7 to 15 days, and custom samples take longer.

How long is faucet bulk production?

Bulk faucet production usually takes 25 to 45 days after sample approval and deposit.

Can VIGA rush my order?

Rush production is sometimes possible for stock models depending on the factory schedule and materials.

What factors affect the lead time?

Quantity, finish, custom tooling, logo and packaging all affect the faucet lead time.

Live Chat
Leave a message